STEALTH-LOCK™

BLUE OCEAN OIL IS THE APPROVED REPRESENTATIVE FOR STEALTH-LOCK IN AFRICA.

DESCRIPTION

Stealth-Lock™ MIF (Mechanical Interference Fit) mechanical connections have been widely applied in service over three decades. AGODCO has developed the MIF connections to be confidently acceptable for application with CS (carbon steel), FBE (fusion bonded epoxy), 3LPP (3 layer polypropylene) and PE (polyethylene) Liner applications. Our MIF connection is cold-formed from standard API 5L line pipe, with proven integrity and, at a construction rate of up to 2km per day per crew, it is unique in commercial and productivity values.

MATERIAL & STRENGTH DATA

TYPICAL GENERIC API PIPE GRADESGrade B to X70; SMLS or ERW
DIAMETER SIZE RANGENPS 2-inch to 16-inch
TYPICAL DIAMETERS for FLOW-LINESNPS 2 to 8-inch
TYPICAL WTs for Stealth-Lock™Sch. 40 to Sch. 80
TYPICAL APPROVED PRESSURE CLASS900# 175 barg
ALIDATED UYS test to failure (ISO 21329)*594 to 902 barg

PRODUCTIVITY & PERFORMANCE DATA

STEALTH-LOCK™ JOINTS INSTALLED WORLDWIDE>1,262,000 (updated 02.24)
STEALTH-LOCK™ LEAKS IN SERVICE WORLDWIDE0
LTI’s SINCE 2011 INTRODUCTION FROM AGODCO0
TYPICAL CONSTRUCTION PER DAY PER CREW1-2 km
RT JOINT INSPECTION REQUIREMENT 00
LIGHT SANDSTORM WORK STOPPAGES0
MANHOURS PER KM COMPARED TO WELDING17%
GHGs EMISSIONS PER KM COMPARED TO WELDING 1.5%18%

* Independent validation tests performed at STRESS Engineering Laboratory, Houston, Texas, USA.

Click below for more technical details.

Client Value Gains

  • 82% reduction of GHG emissions per km
  •  91% risk reduction for Lost Time Incidents
  • 91% reduction in “hot-works”
  • Well Hook-ups at double the usual rate
  • Project completions at 50% timeline
  • Production in service accelerated
  • Cash Conversion Cycle greatly reduced
  • Lower project investment capital employed
  • Supply-chain management reduced
  • Inventory management & cost reduction
  • Vertically Integrated project management

Contractor Value Gains

  • Reduce welding assets up to 80%
  • Reduce welding manpower up to 80%
  • Reduce food & accommodation costs by 70%
  • Reduce transportation costs by 50%
  • Complete projects in 50% of timeline
  • Accelerate cashflow by 200%
  • Increase profit from marginal to circa 25%
  • 91% risk reduction for Lost Time Incidents
  • 83% risk reduction for Covid virus transmission